Skip to content
Artisan
Year
2008
Photos
16

Hellboy II

Progress

A record of the work.

The photographs run in the order they were taken — from the state before the work to the finished job.

  1. Detail of gilded sculpture at the entrance to an interior set
    01
  2. Interior set with a red carpet and a sculpture in the foreground
    02
  3. Interior set with a staircase and monumental figures
    03
  4. View into the interior set, figures to either side
    04
  5. Street set under construction, scaffolding along the facades
    05
  6. Street set under construction with building material
    06
  7. Stone cladding of the set during installation
    07
  8. The set under scaffolding, seen from the side
    08
  9. Finished street facade of the set
    09
  10. Set facade with coloured render and windows
    10
  11. Street facade of the set, close up
    11
  12. Two building sets side by side
    12
  13. View down a street built from sets
    13
  14. Detail of a set facade with its cornices
    14
  15. Set facade with a lift during the final stages
    15
  16. Modelling the figures for Hellboy II
    16